
Carousel pallet circulation line
Complete pallet circulation circuit — 42 pallets, shuttle, tilting table and curing rack — cleared from a plant product change.
- Year
- 2016
- Usage
- —
Standards & associations






















































Compulsory twin-shaft mixer with hydraulic discharge gate, moisture probe and a rebuilt gearbox at 6,200 hours.
Verified listing1 / 3
A compulsory twin-shaft mixer at 2.5 m³ compacted output, with hydraulic discharge gate, moisture probe and a gearbox rebuilt at 6,200 hours. Offered refurbished with its operating record.

11,400 hours on the machine, with the gearbox rebuild at 6,200 hours and liners replaced in 2024. The history is what sets the price against a new unit.

The unit is offered for removal from its current installation. Control integration depends on what the receiving plant runs.
What this mixer is suited to and where it sits in a plant.

The mixing stage of a batching plant, taking aggregate and cement and discharging to transport.

Sized at 2.5 m³ per 45 second cycle, suited to a plant running continuous precast output.

Bought as a refurbished replacement where a new mixer cannot be justified on cost.
11,400 hours total, with the gearbox rebuilt at 6,200 hours.
They were replaced in 2024, so the mixing chamber is not at the end of its wear life.
2.5 m³ compacted on a 45 second cycle, driven by two 55 kW motors.
A Siemens S7-1500, with a moisture probe on the batch.
It is offered refurbished from its current installation. Inspection is arranged through the listing vendor.

Complete pallet circulation circuit — 42 pallets, shuttle, tilting table and curing rack — cleared from a plant product change.

Hydraulic core-puller form for 2400 × 1800 box culverts, with quick-release side panels and integral vibration.

Insulated curing chamber with steam generator, programmable ramp control and data logging for 24 pallets.